Semi Mobile System
The DC 5900/5800c can be docked to a temporary or permanent tubing system installed in the work area. With a branch pipe package (item 3353), a temporary pipeline can be built in a stairwell or in a shakt. Several branch pipe packages can be connected in series or in branches.
Show more
Show less
descriptionDocuments north_east
mailContact north_east
Watch video
close
Contact
Documents for Semi Mobile System
description Dustcontrol_Semi Mobile System_Cosntruction_Folder_ENG download
Dustcontrol UK Ltd., 7 Beaufort Court , Roebuck Way Knowlhill, Milton Keynes MK5 8HL